CLASICRADIOSONDE
CLASIC - Radiosonde Campaign
1 June 2007 - 30 June 2007
Lead Scientist: Brad Orr
Observatory: sgp, sgp
In support of CLASIC, radiosonde launches were provided during two 5-day campaigns with eight radiosonde launches per day at each of the BFs along with the routine 4 per day at the CF. The dates of the 5-day campaigns were based on weather forecasts relative to project objectives and therefore not be determined until the project began. Each BF launched 1 sounding per day at three of the BFs during the remaining 11 days of CLASIC, the northern BF, Hillsboro, being excluded.
Timeline
- Parent Campaign
- Sibling Campaign
Related Publications
2019
Tang S, C Tao, S Xie, and M Zhang. 2019. Description of the ARM Large-Scale Forcing Data from the Constrained Variational Analysis (VARANAL) Version 2. Ed. by Robert Stafford, ARM user facility. DOE/SC-ARM-TR-222. 10.2172/1808705.
2007
Miller MA, R Avissar, L Berg, S Edgerton, M Fischer, T Jackson, W Kustas, P Lamb, G McFarquhar, Q Min, B Schmid, M Torn, and D Turner. 2007. SGP Cloud and Land Surface Interaction Campaign (CLASIC): Science and Implementation Plan. U.S. Department of Energy. DOE/SC-ARM-0703. 10.2172/948100.
View All Related Publications
Campaign Data Sets
IOP Participant | Data Source Name | Final Data |
---|---|---|
Brad Orr | Radiosonde Data | Order Data |