SUbsonic Aircraft: Contrail & Cloud Effects Special Study (SUCCESS)

1 April 1996 - 31 May 1996

Lead Scientist: Randy Peppler

Observatory: sgp, sgp

The purpose is to determine the impact of the current and future subsonic aircraft fleet on Earth's radiation budget and climate. SUCCESS Mission Home Page

Activity Summary

Locations and Status of Extended Facilitiesa

                                                                  SMOS(c)                            Comments                
Site           Elevation(b) Latitude,   Surface     Flux                 SIROS(c)                                            
               (m)         Longitude    Type        Station(c)                                                               
                           (deg)                                                                                           
Larned, KS          632    38.202 N     Wheat       ECOR       Yes       Yes       Power and communication center         
EF-1                       99.316 W                 9/95       9/95      9/95      installation planned for July 1995      
Hillsboro,          450    38.306 N     Pasture     EBBR 8/95  No        Yes 8/95  Power and communication center          
KS EF-2                    97.301 W                                                installation planned for July 1995      
LeRoy, KS           338    38.201 N     Wheat and   ECOR       Yes       Yes       Power and communication center          
EF-3                       95.597 W     soybeans    10/95      10/95     10/95     installation planned for September      
                                        (rotated)                                  1995                                    
Plevna, KS          513    37.953 N     Rangeland   EBBR       Yes       Yes       Power and communication center          
EF-4                       98.329 W     (ungrazed)  4/4/93     3/28/95   3/28/95   installed March 1995                    
Hesston, KS         --     No           --          --         --        --        Lease cancelled in 1995; no new         
EF-5                       location                                                location identified at this time        
                           identified                                                                                      
Towanda, KS         409    37.842 N     Alfalfa     ECOR 9/95  Yes 9/95  Yes 9/95  Power and communication center          
EF-6                       97.020 W                                                installation planned for August 1995    
Elk Falls,          283    37.383 N     Pasture     EBBR       Yes       Yes       Power and communication center          
KS EF-7                    96.180 W                 9/8/93     3/9/95    3/9/95    installed February 1995                 
Coldwater,          664    37.333 N     Rangeland   EBBR       Yes       Yes       Power and communication center          
KS EF-8                    99.309 W     (grazed)    12/8/92    3/4/93    5/9/95    installed May 1995                      
Ashton, KS          386    37.133 N     Pasture     EBBR       Yes       Yes       Power and communication center          
EF-9                       97.266 W                 12/10/92   3/13/90   10/5/93   installed October 1993                  

Tyro, KS            248    37.068 N     Wheat       ECOR       Yes       Yes       Power and communication center         
EF-10                      95.788 W                 7/95       7/95      7/95      installation planned for June 1995      
Byron, OK           360    36.881 N     Alfalfa     ECOR       Yes       Yes       Power and communication center         
EF-11                      98.285 W                 6/26/95    6/26/95   6/26/95   installation planned for June 1995      
Pawhuska, OK        331    36.841 N     Native      EBBR       None      Yes       Power and communication center          
EF-12                      96.427 W     Prairie     9/11/93              6/30/95   installation planned for June 1995      
Lamont, OK          318    36.605 N     Pasture     EBBR       Yes       Yes       Power and communication center          
EF-13, 14                  97.485 W     Wheat       8/24/92    4/9/93    10/15/93  installed June 1993                     
                                                    ECOR                 BSRN                                              
                                                    5/30/95              5/15/92                                           
Ringwood, OK        418    36.431 N     Pasture     EBBR       Yes       Yes       Power and communication center          
EF-15                      98.284 W                 9/25/92    3/29/93   10/12/93  installed October 1993                  
Vici, OK            602    36.061 N     Wheat       ECOR       No        Yes       Power and communication center          
EF-16                      99.134 W                 5/30/95              5/30/95   installed May 1995                      
EF-17               --     Unspecified  --          --         --        --        --                                      
Morris, OK          217    35.687 N     Pasture     EBBR       No        Yes       Power and communication center          
EF-18                      97.856 W     (ungrazed)  10/95                10/95     installation planned for September      
                                                                                   1995                                    


El Reno, OK         --     No           --          --         --        --        Lease cancelled 1995; no new           
EF-19                      location                                                location identified at this time        
                           identified                                                                                      
Meeker, OK          309    35.564 N     Pasture     EBBR       Yes       Yes       Power and communication center          
EF-20                      96.988 W                 4/3/93     4/2/93              installed October 1994                  
Okmulgee,           --     No           Forest      ECOR       Yes       Yes       No lease agreement; power and          
OK EF-21                   location                                                communication center installation       
                           identified                                              unknown at this time                    
Cordell, OK         465    35.354 N                 EBBR       No        Yes       Power and communication center         
EF-22                      98.977 W     Rangeland   4/4/93               4/26/95   installed March 1995                    
                                        (grazed)                                                                           
Ft. Cobb, OK        415    35.153 N     Peanuts     ECOR       No        Yes       Power and communication center          
EF-23                      98.461 W     (irrigated  10/95                10/95     installation planned for October 1995   
                                        )                                                                                  
Cyril, OK           409    34.883 N     Wheat       ECOR 8/95  Yes 8/95  Yes 8/95  Power and communication center          
EF-24                      98.205 W     (gypsum                                    installation planned for June 1995      
                                        hill)                                                                              
EF-25               --     Unspecified  --          --         --        --        --                                      
Cement, OK          400    34.957 N     Pasture     EBBR       No        No        Phone line (only) installed October     
EF-26                      98.076 W                 9/20/92                        1992                                    

a ECOR, eddy correlation; EBBR, energy balance Bowen ratio; BSRN, Broadband Solar Radiation Network. b Above sea level. c Date indicates actual or scheduled installation date.

Timeline

2016

Shupe MD, JM Comstock, DD Turner, and GG Mace. 2016. Cloud property retrievals in the ARM Program. In The Atmospheric Radiation Program: The First 20 Years, pp. 1-20. .

2000

Miller SD, GL Stephens, CK Drummond, AK Heidinger, and PT Partain. 2000. "A multisensor diagnostic satellite cloud property retrieval scheme." Journal of Geophysical Research: Atmospheres, 105(D15), 10.1029/2000jd900273.

Baum B, P Soulen, K Strabala, M King, SA Ackerman, WP Menzel, and P Yang. 2000. "Remote sensing of cloud properties using MODIS airborne simulator imagery during SUCCESS: 2. Cloud thermodynamic phase." Journal of Geophysical Research: Atmospheres, 105(D9), 10.1029/1999jd901090.

Chung S, S Ackerman, PV Delst, and WP Menzel. 2000. "Model Calculations and Interferometer Measurements of Ice-Cloud Characteristics." Journal of Applied Meteorology, 39(5), 10.1175/1520-0450-39.5.634.

Baum B and J Spinhirne. 2000. "Remote sensing of cloud properties using MODIS airborne simulator imagery during SUCCESS: 3. Cloud Overlap." Journal of Geophysical Research: Atmospheres, 105(D9), 10.1029/1999jd901091.

Baum BA, D Kratz, P Yang, SC Ou, Y Hu, P Soulen, and S-C Tsay. 2000. "Remote sensing of cloud properties using MODIS airborne simulator imagery during SUCCESS: 1. Data and models." Journal of Geophysical Research: Atmospheres, 105(D9), 10.1029/1999jd901089.

1999

Valero FP and BC Bush. 1999. "Measured and calculated clear-sky solar radiative fluxes during the Subsonic Aircraft Contrail and Cloud Effects Special Study (SUCCESS)." Journal of Geophysical Research: Atmospheres, 104(D22), 10.1029/1999jd900947.

Partain P, S Miller, GL Stephens, RF McCoy, and R McCoy. 1999. SSP Cloud Retrieval Based Shortwave Flux Simulations During ARESE and SUCCESS. In Proceedings of the Ninth Annual ARM Science Team Meeting, Ed. by N. Burleigh and D. Carrothers, Richland, WA: U.S. Department of Energy.

1998

Jensen EJ, OB Toon, A Tabazadeh, GW Sachse, BE Anderson, KR Chan, CW Twohy, B Gandrud, SM Aulenbach, A Heymsfield, J Hallett, and B Gary. 1998. "Ice nucleation processes in upper tropospheric wave-clouds observed during SUCCESS." Geophysical Research Letters, 25(9), 10.1029/98gl00299.

Heymsfield AJ, LM Miloshevich, C Twohy, G Sachse, and S Oltmans. 1998. "Upper-tropospheric relative humidity observations and implications for cirrus ice nucleation." Geophysical Research Letters, 25(9), 10.1029/98gl01089.


View All Related Publications

Campaign Data Sets

IOP Participant Data Source Name Final Data
Thomas Ackerman 94 GHz Radar Order Data
Dave Beal ASD Spectrometer Order Data
John DeLuisi Radiometry Order Data
Wynn Eberhard CO2 Lidar Order Data
Rangasayi Halthore CIMEL Order Data
Philip Hammer AERI-X Order Data
Philip Hammer DASI Order Data
Gerald Mace Polarization Lidar Order Data
Frank Murcray ASTI Order Data
Peter Pilewskie Solar Spectrometer Order Data
C. Platt LIRAD Order Data